Milestone reached in construction of UWE Bristol’s multi-million pound engineering building

Posted on

UWE Bristol’s new multi-million pound engineering building has moved a step closer to completion – construction has reached the top floor!

A topping out ceremony was held on Tuesday 17th September to mark the occasion, with staff and students joining partners from contractors BAM and architects AHR to sign their names on a timber beam at the very top of the building. Head of the Department of Engineering Design and Mathematics Dr Lisa Brodie can be seen adding her signature above.

From left to right: Catherine Hobbs (Associate Dean Research and Enterprise), Matt Smith (BAM Construction), Richard Dewey (BAM), Steve West (Vice-Chancellor), Paul Olomolaiye (Pro Vice-Chancellor and Executive Dean), Lisa Brodie (Head of Engineering Design and Mathematics), Tod Burton (Deputy Dean) and Graham Kingdon (BAM)

Due for completion in summer 2020, the facility will contribute to the University’s vision of being one of the top engineering schools in the country through promoting multi-disciplinary, collaborative learning and supports the predicted increase in demand for skilled engineering graduates across the region.

UWE Bristol staff can read more on the staff intranet.

Leave a Reply

Your email address will not be published. Required fields are marked *